Skip to content

Run fault reporting, work orders, PM, and spare-parts support ​

The operational loop after go-live is fault intake, work execution, PM scheduling, verification, and service evidence capture. Every work order writes back to the device record, building a living service history.

By the end of this stage: The device record becomes a living service history instead of a static inventory entry — with full cost, labor, and parts evidence for audit.

Modules involved: Fault Reports, Work Orders, Maintenance Planner, Spare Parts, Vendor Contracts

What to do ​

1. Capture faults early ​

Clinical and facility users report faults directly against the device so engineering sees the issue in context before a work order is raised.

2. Create executable work ​

Engineering creates or converts work orders from fault reports, assigns technicians, and tracks status through completion and verification.

3. Track cost and effort ​

Technicians record actual duration, labor cost, parts used, and completion notes for an auditable maintenance history against each device.

4. Keep routine support visible ​

PM schedules set the cadence for planned maintenance. Vendor contracts track coverage against specific devices. Spare-parts records link inventory and cost to the work that consumed them.

5. Verify performance, not just presence ​

A performance check records an inspection or a calibration — routine, pre-use, or post-repair — with the measured result against the expected range. It is how a device that is working but drifting gets caught before it fails, and it keeps the calibration history the lifecycle depends on.

6. Learn from the history ​

Every fault carries a failure code and every completed corrective work order carries a real duration, so the facility dashboard can show the recurring-failure view and the mean time to repair without anyone maintaining a separate spreadsheet. Both are all-time figures on the facility dashboard.

Ovahol healthcare equipment management